1、路缘石的施工准备阶段
1. Construction preparation stage of curb
1.1概念介绍
1.1 concept introduction
路缘石指的是设在路面边缘的界石,简称缘石。它是作为设置在路面边缘与其他构造带分界的条石。路缘石是公路两侧路面与路肩之间的条形构造物,因为形成落差,像悬崖,所也路缘石形成的条状构造,也叫道崖。结构尺寸通常是99 cm×15 cm×15 cm。一般高出路面10 cm。路缘石设置在中间分隔带、两侧分隔带及路侧带两侧,缘石可以分为立缘石和平缘石。
Curb refers to the boundary stone set at the edge of the pavement, referred to as the curb. It is set at the edge of the pavement and other structural zones of the boundary stone. The curb is a strip structure between the road surface on both sides of the road and the road shoulder. Because of the formation of the drop, it is like a cliff, so the strip structure formed by the curb is also called the road cliff. The structure size is usually 99 cm × 15 cm × 15 cm. Generally, it is 10 cm higher than the road surface. The curbs are set in the middle divider, both sides of the divider and both sides of the roadside. The curbs can be divided into vertical curbs and flat curbs.
1.2材料选择
1.2 material selection
原材料:水泥、碎石(砾石)、砂等由持证的材料员及试验员按规定进行检验,确保其质量符合相应标准。砂采用质地坚硬、强度高并且耐磨性好的符合设计要求的中砂,选择标号低的普通硅酸盐水泥和粉煤灰水泥,并且水泥要存放在通风干燥的地方,水采用自来水,路缘石采用正规厂家生产的预制块,并且进场材料质保书、复试报告、砼配合比经监理工程师批准。
Raw materials: cement, crushed stone (gravel), sand, etc. shall be inspected by certified material personnel and testers according to regulations to ensure that their quality meets the corresponding standards. The sand shall be medium sand with hard texture, high strength and good wear resistance, which meets the design requirements. Ordinary portland cement and fly ash cement with low grade shall be selected. The cement shall be stored in a ventilated and dry place. The water shall be tap water, and the precast block produced by formal manufacturer shall be used for curbstone. The quality assurance certificate, retest report and concrete mix proportion of the mobilized materials shall be approved by the supervision engineer.
混凝土配合比设计及试验:按混凝土设计强度要求,由试验室做出试验室配合比,根据现场材料作出施工配合比,满足路缘石用混凝土的要求。
Concrete mix proportion design and test: according to the concrete design strength requirements, the laboratory mix proportion is made by the laboratory, and the construction mix proportion is made according to the site materials to meet the requirements of concrete for curbstone.
1.3技术要求
1.3 technical requirements
熟悉和掌握施工图设计文件以及施工现场的地质、水文资料,编制单项工程施工组织设计,施工前就施工的技术与安全问题向现场技术人员、管理人员、施工人员进行确认。检测各种模具尺寸是否统一,现场试验与室内试验结果是否吻合,各种资源配置是否能保证大面积施工等,并编制作业指导书。备齐施工图纸、招标文件及施工技术规范标准,并组织技术及质检人员认真学习,深切理会图纸设计意图,熟悉标准、规范要求,以便指导施工并控制好施工质量。工地试验室对拟使用的材料如水泥、碎石(砾石)、砂等进行检测,同时根据设计标准进行配比试验,配合比试验结果报监理和业主中心试验室认可。
Be familiar with and master the construction drawing design documents and geological and hydrological data of the construction site, prepare the construction organization design of single project, and confirm the construction technology and safety problems to the site technical personnel, management personnel and construction personnel before construction. Check whether the dimensions of various molds are uniform, whether the results of field test and indoor test are consistent, whether the allocation of various resources can ensure large-scale construction, and prepare operation instructions. Prepare construction drawings, bidding documents and construction technical specifications and standards, organize technical and quality inspection personnel to study carefully, deeply understand the design intention of drawings, and be familiar with the requirements of standards and specifications, so as to guide construction and control construction quality. The site laboratory shall test the materials to be used, such as cement, gravel (gravel), sand, etc., and carry out the proportioning test according to the design standards. The results of the mix proportion test shall be submitted to the laboratory of the supervisor and the owner for approval.
1.4仪器和工具
1.4 instruments and tools
搅拌设备:JS350型强制搅拌机、30kW发电机一台、路缘石定型钢模。
Mixing equipment: js350 type forced mixer, a 30kW generator and fixed profile steel mold for curbstone.
运输设备:手椎车
Transportation equipment: handcart
检测及施工设备:水准仪、水平尺、木制锤头、铁锤、手推车、翻斗车、砂浆搅拌机、尼龙线、水准尺、塞尺、勾缝工具、扫把、塑料桶测量仪器:水准仪、全站仪各一套
Detection and construction equipment: level, level, wooden hammer, hammer, trolley, dumper, mortar mixer, nylon line, level gauge, feeler gauge, pointing tool, broom, plastic barrel measuring instrument: one set of level and one set of total station